多层钢结构厂房的施工流程!

来源:http://sxhtyz.com/ 日期:2020-02-24 发布人:
在有限的占地面积满足不了现代工业生产的情况下,有很多企业工厂都选择了建造多层钢结构厂房。但更多的只建到2-3层,这样做的好处就是可以把一个相关的具有连贯性的生产关系,充分利用立体空间的优势,整合在一起。不像单层钢结构厂房那样占用大多的地面面积,可以省出不少的建筑面积。
In the case that the limited floor space can not meet the requirements of modern industrial production, many enterprises choose to build multi-storey steel structure workshops. But most of them are only built to 2-3 layers. The advantage of doing so is to integrate a coherent production relationship and make full use of the advantages of three-dimensional space. Unlike single-layer steel structure workshop, which occupies most of the ground area, it can save a lot of building area.
今天,我们来说说多层钢结构厂房的施工流程,,无论是高层还是单层,在施工前都要制定出工艺流程图,确定构件的安装顺序,分区段施工。钢结构厂房施工自然离不开起重机,无论单层或多层。
Today, let's talk about the construction process of multi-storey steel structure workshop. First of all, whether it is a high-rise or a single-layer building, before construction, we must first develop a process flow chart, determine the installation sequence of components, and construct in sections. The construction of steel structure workshop is naturally inseparable from the crane, no matter single or multi-layer.
济南复合板厂
所以,其次需要注意的是,起重机不可以超负荷作业,在吊装能力允许的情况下,可以再地面完成的组装工作,我们要尽可能的避免在高空作业。
Therefore, the second thing we need to pay attention to is that the crane can not be overloaded. When the lifting capacity allows, the assembly work can be completed on the ground. We need to avoid working at heights as much as possible.
钢结构厂房安装前,要根据建筑物的结构形式和现场的施工条件来划分安装流水段。安装流程应以从中部对称地向四周发展,竖向根据工艺流程制定焊接顺序。一节柱的各层梁安装完后,要立即安装楼梯以及楼承板,楼承板上的对房屋不能超过其承载。进行楼承板上的混凝土施工和构件的安装。
Before the installation of the steel structure workshop, the installation flow section shall be divided according to the structural form of the building and the site construction conditions. The installation process shall be developed symmetrically from the middle to the surrounding, and the welding sequence shall be established vertically according to the process flow. After the installation of each floor beam of a section of column, the stairs and floor bearing plates shall be installed immediately, and the load on the floor bearing plates shall not exceed the load of the house. Finally, the concrete construction and component installation on the floor bearing plate are carried out.
此文关键词:   

阅读/ Recommended reading

彩钢夹芯板是由上下两层彩色涂层钢板作为面板,以保温隔热材料聚苯乙烯、聚氨脂、酚醛泡沫、岩棉等为芯材,在专用的自动化生产线上,经连续成型工艺将芯材与面板复合成整体的建筑板材,俗称为...

济南彩钢板:彩钢板常见质量问题 2024-09-21
济南彩钢板:彩钢瓦生锈了怎么办? 翻新需要打磨吗? 2024-09-03
济南彩钢瓦厂:树脂瓦与彩钢瓦谁耐用 2024-09-02
济南C型钢厂:关于C型钢常见知识与抗震支架应用的相关知识 2024-08-28